Overview

The Marine Gateway development was a massive and challenging project, but one we were uniquely capable of completing. Supported by local fabrication, our crew of more than 40 field installers worked through a 15-month installation schedule to successfully install over 200,000 square feet of façade. Engineered, fabricated and installed by KPS, the façade included iridescent aluminum composite panels, terracotta and decorative, extruded aluminum grilles.

“KPS was the natural choice for Marine Gateway’s size, schedule and complexity. Their experienced team helped guide the project through design, budgeting, scheduling, shop drawings, procurement and construction. The service and professionalism KPS is widely recognized for played a key role in the project’s success.”

Jonathan Boyce
Senior Project Manager, Ledcor Construction