Skip to main content
KPS Project Nike Garage Beaverton Panel Fabrication

Nike Headquarters NYC Garage
Beaverton

Project info

Complete in December 2017, the Nike NYC Garage project was designed by SRG Portland and built by Hoffman Construction. Providing 1900 parking spots to Nike employees at the Portland Campus, the building is highlighted by vivid Nike Orange aluminum composite panels at the stair towers, parking ramps and entrances. These features contrast against the various grey tones of the main structure.

Perhaps the greatest challenge overcome on this project was the complex geometry of the stairs and ramps. Each stair tower required 250-300 unique panels, covering every surface with the exception of the stair tread. Initially, the fabrication was to be based on guaranteed dimensions, however, after a cursory check, it was clear that the structure was outside the required tolerance. As such, each element had to be 3D modeled. In co-ordination with McKinstry’s on-site personnel, our in-house engineering team was able to model the as-built structure, then use that structure to determine panel sizes and dimensions.

2017

Aluminum Composite Material (ACM)Copper

System A-Plus

SRG Portland

01 / 01
KPS Project Nike Garage Beaverton Metal Siding
KPS Project Nike Garage Material Construction Panel Company